Alexander Fässler

Diplomová práce

Inefficient management practices and processes on construction sites: Possible solutions to improve construction productivity

Inefficiencies on Construction Sites in Switzerland: Solutions to Increase Productivity
Anotace:
This thesis was written to examine current inefficiencies on construction sites in Switzerland and to find innovative solutions that aim to increase overall productivity. The findings are based on extensive academic literature review, expert interviews with construction professionals, construction site visits and benchmarking companies from other industries. The research focuses on Construction Project …více
Abstract:
This thesis was written to examine current inefficiencies on construction sites in Switzerland and to find innovative solutions that aim to increase overall productivity. The findings are based on extensive academic literature review, expert interviews with construction professionals, construction site visits and benchmarking companies from other industries. The research focuses on Construction Project …více
 
 
Jazyk práce: angličtina
Datum vytvoření / odevzdání či podání práce: 16. 1. 2019

Obhajoba závěrečné práce

  • Obhajoba proběhla 27. 1. 2020
  • Vedoucí: Ladislav Tyll
  • Oponent: Patrik Sieber

Citační záznam

Plný text práce

Obsah online archivu závěrečné práce
Zveřejněno v Theses:
  • autentizovaným zaměstnancům ze stejné školy/fakulty
Jak jinak získat přístup k textu
Instituce archivující a zpřístupňující práci: Vysoká škola ekonomická v Praze
http://www.vse.cz/vskp/eid/77586